Work backwards from your release date

Most missed opportunities in a release are missed deadlines, not missed talent. Enter the date you want to be live and get every step dated backwards from it — including the pitch deadline, which is the one that cannot be recovered.

Everything on this page runs inside your browser. No file, image or text you enter here is uploaded, stored or sent anywhere, and no account is needed. The checks reflect published store requirements, which change — always read your distributor's current rules as well.

Loading the tool…

How this works, and why it matters

Why eight weeks

Nothing about a release needs eight weeks. What needs eight weeks is the accumulation of things that can go wrong: an artwork rejection that takes three days to discover and two days to fix, a metadata correction, a licence that has to be chased, a store profile that has to be claimed. Deliver three weeks out and one rejection still leaves you room. Deliver three days out and the same rejection moves your date, along with everything you built around it.

The pitch deadline is the hard one

The main editorial pitch closes seven days before release, and it takes one song at a time from the primary artist. It is not only about editorial playlists: pitching also drives the automatic new-release placement that puts you in front of the people who already follow you. Miss the window and you do not lose a maybe, you lose a certainty. Everything else on this timeline can slip a little. This one cannot slip at all.

Register the writing side separately

Distribution pays the recording. The composition is a separate right with a separate income stream, collected by your performing rights organisation and your mechanical agency, and it only pays if the work is registered. Unregistered compositions sit in unclaimed pools for years and are often never recovered. Register before release, not after, and make sure the writer splits on the registration match the split sheet everyone actually signed.

Split sheets before release, not after

A split sheet is a page with the song title, every writer, their share, their society and their signature. It takes ten minutes on the day everyone is in the room and pleased with each other. Written after a song does well, it takes lawyers. Nothing in independent music produces more permanent damage per unit of effort avoided than the split sheet that never got written.

What happens after release day

The first week is not when a release succeeds or fails, but it is when the platforms decide how much to help. They watch saves, playlist adds and repeat listens rather than raw plays, and they respond to sustained activity rather than a single day of it. Plan the month after release with the same care as the month before it, and read the reports properly at the end — the territories that responded tell you where the next release should be aimed.

Questions and answers

Is eight weeks really necessary for a single?

It is comfortable, not necessary. Four weeks is workable if nothing goes wrong. The immovable parts are seven days before release for the editorial pitch and enough time before that for the distributor to deliver and the stores to ingest, which is typically one to two weeks.

What if my release date is next week?

Then the pitch window is already gone and you should decide whether that matters. If it does, move the date — a date you chose is not worth more than the placement you would forfeit. If it does not, deliver, get the metadata and artwork right, and put your effort into the month after release.

Can I change a release date after delivering?

Usually yes, if you do it early enough, though it depends on your distributor and how far the release has already propagated to the stores. Moving a date after a pre-save campaign has started is messier than it sounds, because the links and the automated notifications do not all move with it.

Does releasing on a Friday matter?

Friday is the global new-music day and the charting week starts then, so most releases and most editorial refreshes align to it. Releasing on another day is not a mistake, but it puts you outside the rhythm the platforms are built around, and there is rarely a good reason to.

How far ahead should I plan the next release?

Before this one comes out. The gap between releases matters more than any single release does, and the easiest time to plan the next one is while the current one still has your attention and its data is still fresh.

Can I export this timeline?

Not yet. For now, the dates are on the page and you can copy them into whatever calendar you already use. Everything here runs in your browser with no account and nothing stored, which is also why the tool cannot remember your plan between visits.

Apply for review

You have the dates. Work backwards from the review too.

Applications are read by a human and answered by email, so leave room for that before the date you picked.

Apply for review

Free to apply. No account is created; a human reviews and replies by email.

Going deeper

Two engineering tools for when the basics already pass.

Mastering analysis
LUFS, loudness range, true peak, PSR, spectrum, mono behaviour and a real codec round-trip.
Immersive master inspector
Reads the BW64 container and ADM metadata and checks it against the published delivery specification.

The other free tools

Free, no account, nothing uploaded. Everything runs in your browser.

Loudness & true peak checker
Measure integrated LUFS and true peak, and see what each service will do to your master.
Cover art checker
Check size, ratio, colour mode and detail — and see your cover at store thumbnail sizes.
Metadata checker
Test artist, title, version and featured credits against the published store rules.
ISRC & barcode checker
Validate an ISRC and verify or calculate a barcode check digit.